Greek Association of Renewable Electricity Producers (GAREP) |
Continuous provision of technical and consulting support in all the activities of the Association. Representation of the Association before Greek, European and International authorities and organizations. |
2010-2019 |
Aeoliki Belecheri S.A./ Piraeus Bank S.A. |
Provision of due diligence support services for nine (9) wind farms of 280 MW total capacity |
2018-2019 |
Ilision S.A.- Rhodes Wind Farm S.A.- Aeolos S.A. |
Provision of technical and consulting support services for the renewal of the generation and / or environmental licenses of an operating 4 MW Small Hydropower Plant in Epirus, an operating 12 MW wind farm in Rhodes, and two 20 MW operating wind farms in Crete, Greece. |
2013-2018 |
Hydroelectric Factories S.A.
|
Preparation and submission of an application file for a 490 MW electricity supply license. |
2016-2017 |
Terna Energy S.A. |
Preparation of required studies and application files to the Greek Ministry of Economics for the public financing of three (3) biomass projects in Northern Greece and three (3) wind farms in Central Greece. |
2013-2014 |
First Solar GmbH |
Consulting Support Services for the Greek Non Connected Islands Diesel Replacement Program. |
2013 |
Aeolos S.A. |
Feasibility study for upgrading two operating wind farms of 20 MW total capacity in the island of Crete, Greece. |
2013 |
PPC Renewables – Terna Energy S.A. |
Provision of technical and consulting support services for the environmental licensing and the co-financing of a 10 MW Small Hydropower Plant in Peloponese, Greece. |
2012-2014 |
Enyp Ltd. |
Provision of technical and consulting support for the development of PV and biomass projects in Greece. |
2012 |
Millenium Bank S.A. |
Provision of consulting support services / due diligence for the purchase of a 4 MW small Hydropower Plant in Epirus. |
2011 |
Gaiaose S.A. |
Feasibility study and provision of licensing support for the development of PV stations on real estate property belonging to the Greek National Railway Company (OSE). |
2010-2011 |
Enteka S.A. |
Preparation of required studies and application files to the Greek Ministry of Economics for the public financing of two (2) wind farms in Greece. |
2009-2010 |
Terna Energy S.A. |
Preparation of required studies and application files to the Greek Ministry of Economics for the public financing of nine (9) wind farms in Greece. |
2009-2010 |
Athens International Airport (AIA) |
Provision of full consultancy services and preparation of all required studies and application files for the design, licensing, public co-financing, procurement and installation of an 8 MWe photovoltaic station in the premises of the Athens International Airport at Spata, Greece. |
2007-2010 |
Terna Energy S.A. |
Market surveys and exploratory actions in regard to the sustainable management and energy utilisation of the by-products and residues of olive tree cultivations and olive oil mills in the Prefecture of Messinia. |
2009 |
Regulatory Authority for Energy (RAE) |
Technical and economic studies for the energy valorisation of landfill gas in Greek islands for the production of electricity. |
2008 |
Electrabel S.A. (Belgium) |
Provision of technical consultancy services during the due diligence process of the MELTEMI Project (9 Wind Parks) in Greece. |
2008 |
BBDO ADVERT S.A |
Provision of consultancy services during design and preparation of RAE’s National Campaign for Energy. |
2007-2008 |
Aeolos S.A. |
Provision of technical consultancy services for the development of RES projects throughout Greece. |
2006-2008 |
Regulatory Authority for Energy (RAE) |
Provision of specialised energy consultancy services during RAE’s large-scale survey of the energy consumers’ market in Greece. |
2006-2007 |
Endesa Hellas S.A. |
Formulation of an integrated business plan for the full portfolio of renewable energy projects of Endesa Hellas S.A. |
2007 |
Aeolos S.A. |
Technical and economic feasibility studies and preparation of all necessary application files for the granting of electricity generation licenses to six (6) PV stations in Greece (30 MWe total capacity). |
2007 |
Regulatory Authority for Energy (RAE) |
Air conditioning technologies for buildings and their utilisation in curbing the summer peak electricity demand and in limiting the energy consumption for cooling (Study). |
2007 |
Service Press S.A. |
Technical and economic feasibility study for the installation and operation of a 1 MWe photovoltaic station in the Prefecture of Corfu. |
2006-2007 |
Regulatory Authority for Energy (RAE) |
Large-scale market survey of industrial, commercial, agricultural and domestic energy consumers in Greece. |
2006-2007 |
Terna Energy S.A. |
Preparation, submission and support of an application file to the Ministry of Economy for the public funding of a Pilot Innovative Development Plan dealing with the management and energy valorisation of liquid waste effluents from the three-phase olive mills in the Prefecture of Magnissia. |
2006-2007 |
Energy Office of the Prefecture of Dodecanese |
Study of biomass utilisation in the island of Rhodes through the energy exploitation of the discarded olive pomace. |
2006-2007 |
Elmin S.A. |
Technical and economic feasibility study for the installation and operation of a 1 MWe photovoltaic station in the Prefecture of Fokis. |
2006 |
MARKO LTD |
Study of the current status and development prospects of PV projects in Greece. |
2006 |
Attica Highway (“Attiki Odos”) S.A. |
Technical and economic feasibility study for the installation and operation of a network of PV systems along the Attica Highway. |
2005-2006 |
Terna Energy S.A. |
Technical and economic feasibility study for the development of new technological methods and projects for the management of liquid wastes from three-phase olive mills. |
2005-2006 |
Terna Energy S.A. / Lobbe-Tzilalis S.A. |
Detailed feasibility study for the collection, transportation and thermal treatment of hospital wastes in Greece. |
2005 |
Kantor S.A. |
Provision of consultancy services for the cost-efficient application of the CO2 emissions trading system to the operations of the Thessaly Steel and the Hellenic Steel Industries. |
2004-2005 |
Motor Oil Hellas S.A. / Avin Oil S.A. |
Environmental impact assessment study on the construction and operation of a 400 MWe natural gas-fired electricity generation plant at the industrial (refinery) complex of Motor Oil in Agii Theodori, Korinthos, Greece. |
2004-2005 |
Greek Association of RES Electricity Producers -GAREP |
Construction, maintenance and management of the GAREP website (www.hellasres.gr). |
2002-2004 |
Tomi S.A. |
Technical and economic feasibility studies for the development of three (3) small hydroelectric power plants in the Prefecture of Aetoloakarnania, Greece. |
2002 |
Tomi S.A. |
Report on electricity sale tariffs for independent RES and CHP power producers in Greece. |
2001 |
Center for Renewable Energy Sources – CRES |
Formulation of a detailed methodology package for the assessment of the technically and economically viable biomass potential in Greece (Study). |
2000 |
Region of Crete |
Study for the integration of small hydropower plants into wider water management projects in Crete. |
1999-2000 |
Center for Renewable Energy Sources – CRES |
Study of the legal and administrative framework regarding renewable energy sources in Greece. |
1999-2000 |
Center for Renewable Energy Sources – CRES |
Consultancy services for the application and specialisation of CRES’s five-year Business Plan (1997 – 2001). |
1998-1999 |
Crete Bioelectric S.A. |
Environmental impact assessment study on the fuel management, construction and operation of a 23 MWe biomass-fired heat and power plant in Crete. |
1998-1999 |
Project Development & Engineering Company of the Prefecture of Euboea – TENAE S.A. |
Technical/economic consultancy services for the effective development and utilisation of Euboea’s full hydropower potential. |
1998 |
Project Development & Engineering Company of the Prefecture of Euboea – TENAE S.A. |
Feasibility study for the optimal exploitation of the biomass potential in the wider Kymi-Aliveri area of Euboea (energy crops, agricultural and forestry residues, district – heating applications, etc.). |
1998 |
Energy Products of Idaho (U.S.A.) / Impax Capital Corporation (U.K.) |
Technical/economic feasibility study for the construction and operation of a 23 MWe combined heat and power (CHP) plant in Crete, utilising agricultural wastes and residues as fuel. |
1997 |
Gener S.A.
|
Prefeasibility study for the construction and operation of a 4.1 MWe small hydropower plant at Vorino (Prefecture of Pella). |
1997 |
Project Development & Engineering Company of the Prefecture of Euboea – TENAE S.A. |
Technical / economic feasibility study for the construction and operation of a 1.38 MWe small hydropower plant at Manikia, Kymi (Prefecture of Euboea). |
1997 |
Hydroenergy S.A. |
Technical / economic feasibility study for the construction and operation of a 0.85 MWe small hydropower plant at Anthohori (Region of Epirus). |
1997 |
Greek Ministry of Development / Center for Renewable Energy Sources – CRES |
Detailed business plan for the Greek Center for Renewable Energy Sources (C.R.E.S.), in the 1996-2001 period. |
1996-1997 |
Public Gas Corporation of Greece – DEPA S.A.
|
Environmental impact assessment study on the construction and operation of the natural gas medium pressure (19 bar), steel pipeline network in the Oinofyta- Schimatari area (Prefecture of Attica). |
1996 |
Public Gas Corporation of Greece – DEPA S.A.
|
Environmental impact assessment study on the construction and operation of the low pressure (4 bar) and the medium pressure (19 bar) natural gas distribution networks in the greater Athens area and in the Thriassion Fields. |
1995-1996 |
Piraeus Harbour State Organisation – O.L.P. |
Environmental impact assessment study on the railway connection of the new containers terminal at N.Ikonio with the O.S.E. terminal at Thriassion Fields. |
1995 |
Piraeus Harbour State Organisation – O.L.P. |
Environmental impact assessment study on the conversion of Piraeus’s Central Harbour to an all-passenger transporting facility. |
1994 |
Municipality of Daphne, Athens |
Upgrading and optimisation of the waste management system of the Daphne Municipality in Athens. |
1994 |
Athena S.A. – Archimedes S.A./ Piraeus Harbour State Organisation – O.L.P. |
Environmental impact assessment study on the construction of the N. Ikonio pier II, in the greater Piraeus Harbour. |
1994 |
Nafsi Shipyards S.A. |
Environmental impact assessment study on the installation and operation of a floating-tank facility for ship repair and maintenance in Salamis island, Saronicos Bay. |
1994 |
K.G. Routsis S.A./ Piraeus Harbour State Organisation – O.L.P. |
Environmental impact assessment study on the construction and operation of the Piraeus-Schistos peripheral (ring) highway. |
1994 |
K.G. Routsis S.A./ Piraeus Harbour State Organisation – O.L.P. |
Environmental impact assessment study on the construction and operation of the underground car parking station in Karaiskaki Square (Piraeus). |
1994 |
Karras Shipyards |
Environmental impact assessment study on the installation and operation of a floating-tank facility for ship repair and maintenance in Kynosoura, Salamis island. |
1993 |
Municipality of Glyfada, Athens |
Optimisation of the existing waste management system of the Municipality of Glyfada, Athens. |
1992 |
Municipality of Aliveri, Euboea |
Feasibility study for the design and application of a waste recycling programme in the Municipality of Aliveri, Euboea. |
1992 |